“We didn’t assume everyone ‘knew MicroStation,’” he said. “We wrote down exactly how this team, on this project, would use it. The software works. It’s the human agreement on requirements that makes it magic.”
The drainage lead grumbled but fixed it in two hours. No misalignment. No rework.
“Did they use the same seed file?” David asked.
David realized they needed a formal —not just a general BIM execution plan. He locked himself in a conference room with three senior CAD technicians and the IT infrastructure lead. Over two days, they reverse-engineered the project’s true needs.
David opened the master .DGN file on his workstation. He toggled the structural reference file. The mismatch was glaring—a red line cutting through grey slabs.
“We didn’t assume everyone ‘knew MicroStation,’” he said. “We wrote down exactly how this team, on this project, would use it. The software works. It’s the human agreement on requirements that makes it magic.”
The drainage lead grumbled but fixed it in two hours. No misalignment. No rework.
“Did they use the same seed file?” David asked.
David realized they needed a formal —not just a general BIM execution plan. He locked himself in a conference room with three senior CAD technicians and the IT infrastructure lead. Over two days, they reverse-engineered the project’s true needs.
David opened the master .DGN file on his workstation. He toggled the structural reference file. The mismatch was glaring—a red line cutting through grey slabs.